Had a thought while roasting coffee today and I don't know if there's anything to this, but I'm just going to throw it out there, but as a tool for comparing data from multiple batches after they're finished, what about doing an x axis that's end time minus time. That would align everything at the end of the batches instead of at the start.
The way you'd use this is scan over until you see significant divergence. If that's happening at a low enough temperature closer to the right side of the graph, you're probably fine, if it's happening at higher temperatures closer to the left side you'll probably taste the difference.
I think I'll throw something together and mess around with that soonish.